
Scope Creep Is a Goal-Setting Failure
Every project I've watched go sideways had the same issue. Somebody says "scope creep," everyone nods, and the room decides to blame the Scrum Master for failing to prevent it, or the Product Owner for changing requirements. We should have pushed back harder. We should have had a change control process. We should have been more disciplined. We need more Agile. We need less Agile.


















